Ensigna Construction delivered two mirrored Quad Infill extensions at Varndean College, Brighton, totalling 412m² of new teaching space. The project involved demolition, new-build construction, and full internal fit-out, including classrooms, seminar rooms, breakout areas, and gender-neutral WCs. Built in a live college environment, the scheme required careful scheduling, noise control, and access management. Specialist installations included HVR ventilation, underfloor heating, cavity drain waterproofing, and advanced AV integration. Completed on time and within budget, the project provided high-quality, sustainable spaces that enhance teaching and learning. The client praised Ensigna’s professionalism, delivery, and minimal disruption to college operations.
The Challenges
Working in a live college environment demanded meticulous planning to minimize disruption during operational hours, with measures such as noise suppression and restricted working hours in place. Safety was prioritized through the management of deliveries and contractor access by two dedicated banksmen during peak student times. In the basement and substructure works, a Type C Cavity Drain system was implemented to provide reliable drainage and long-term water resistance, with close coordination between construction and structural teams to address challenges posed by existing ground conditions. Additionally, the integration of FF&E and specialist systems, including teaching walls and interactive boards, required seamless collaboration between the construction team and client representatives to ensure all educational equipment met the necessary functionality and performance standards.
Results
Executing construction within a live college environment required precise coordination to avoid disrupting daily operations, necessitating measures such as restricted working hours and noise control. To ensure safety during busy student periods, two banksmen managed all deliveries and contractor access. In addressing the basement and substructure, a Type C Cavity Drain system was employed to achieve effective water management and long-term resistance, while collaboration with structural teams helped mitigate risks from pre-existing ground conditions. Furthermore, the successful coordination and integration of FF&E and specialist systems—such as interactive boards and teaching walls—demanded close communication between the construction and client teams to meet the functional and technical requirements of the educational spaces.
Ensigna Construction exhibited exemplary professionalism and expertise throughout the project. Their ability to manage construction within an operational college environment ensured minimal disruption. The new Quad Infill extensions have greatly enhanced our facilities and will serve as a vital resource for years to come.
Contact
Address
Head Office
Unit 2, Churchill court
Hortons way
Westerham
Kent
TN16 1BT
Suite 116,
Thames Enterprise Centre,
Building 13,
Thames Industrial Park,
East Tilbury,
RM18 8RH
Unit 1B, Cliffe Yard,
Anthonys Way,
Medway City Estate,
Rochester, Kent,
ME2 4DY